Crane rail fastening system for concrete track (port applications)
- Rail fastening system optimized for crane track environments.
- Ensures fastening stability and reduces maintenance costs through the application of TPE-E elastic components, replaceable clamps, and a bolt anti-loosening structure.
- Applicable to CR73/100 rails and 2- or 4-anchor systems, with vertical and horizontal adjustment capabilities.


